Talking about the maintenance and method of high and low temperature test chamber

Every manufacturer, research institute and colleges and universities must produce artificial three-proof test "wet heat, salt spray, mold", natural high and low temperature test chamber, salt spray corrosion test chamber, mold test chamber, these units must not The lack of products, such equipment is not expensive, if the company purchases one, we will protect them! Today this article mainly explains the knowledge of the maintenance and methods of high and low temperature test chambers.

Talking about the maintenance and method of high and low temperature test chamber

If you encounter high and low temperature test chambers for a long time, in order to extend the life of the equipment, you can follow the steps to make your equipment still the same:

1. Drainage method: set the controller to a temperature, set 65 °C (do not set humidity), after running the machine, the drain pump will start, automatically drain the water in the humidifying water tray;

2, drying method: the test hole of the device is opened, the controller sets a temperature, should be set 87 ° C (do not set humidity), the machine continues to run for 60 minutes, the remaining moisture in the box will be from the test hole at high temperature Run out and finally reach the purpose of drying the test chamber;

3. Turn off the high and low temperature test box total power switch steps: first turn off the main power supply (leakage circuit breaker), then cut off the power supply.